Skip to content

Texas gas well · RRC district 10 · Lease 218771

Producing

SCHULTZ 696

Schultz 696 is a gas well in Lipscomb County, Texas, operated by Highmark Energy Operating, LLC in the Lipscomb (Cleveland) field. The Railroad Commission shows 4,677 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

4,677mcf gas, last 12 months−10% vs prior year
RRC lease
10-218771

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Lipscomb CountyLipscombOchiltreeLipscomb County
Lipscomb County · RRC district 10Open Lipscomb County →
Oil, last 12 months
208 bbl
Gas in Jul 2026
392 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 10% over the last 12 months

4,677 mcf in the 12 months through Jul 2026, against 5,183 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output fell 10% over the last 12 monthsMonthly gas production and oil for SCHULTZ 696, Aug 2023 to Jul 2026. Gas output fell 10% over the last 12 months. 4,677 mcf in the 12 months through Jul 2026, against 5,183 mcf in the 12 months before.Last 12 months: 4,677 mcfmcf per monthbbl per month00200254005060075800100Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 10% over the last 12 monthsMonthly gas production and oil for SCHULTZ 696, Aug 2023 to Jul 2026. Gas output fell 10% over the last 12 months. 4,677 mcf in the 12 months through Jul 2026, against 5,183 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month00200254005060075800100Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 218771, district 10. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since May 2026 the lease's gas goes to a transmission line instead of lease fuel

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Transmission line (2)
  • Lease fuel (1)
Since May 2026 the lease's gas goes to a transmission line instead of lease fuelShare of SCHULTZ 696 gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%May 2026: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since May 2026 the lease's gas goes to a transmission line instead of lease fuelShare of SCHULTZ 696 gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2026 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%May 26: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 218771, district 10. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Feb 2022

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeEOG Resources, Inc., Jan 2020 to Jan 2022; Highmark Energy Operating, LLC, Feb 2022 to Jul 20262020202120222023202420252026Changed Feb 2022EOG Resources, Inc.Jan 2020 to Jan 2022Highmark Energy Operating, LLCFeb 2022 to now
Operators of this lease over timeEOG Resources, Inc., Jan 2020 to Jan 2022; Highmark Energy Operating, LLC, Feb 2022 to Jul 20262020202120222023202420252026Changed Feb 2022EOG Resources, Inc.Jan 2020 to Jan 2022Highmark Energy Operating, LLCFeb 2022 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 218771 in district 10. The API number is the state’s ID for a well.
Wells on SCHULTZ 696
API numberWell no.Status
42-295-329945HActive

SourceTexas Railroad Commission Wellbore Query, district 10, lease 218771.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Cp Energy, L.l.c. gathers it.

    100% of it, on the list since Nov 1, 2017

  • Gas from gas wells

    Energy Transfer Company buys and gathers it.

    Energy Transfer Company buys it: 100% of it, on the list since Nov 1, 2015 · Energy Transfer Company gathers it: 100% of it, on the list since Nov 1, 2015

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

624 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Apr 29, 2006
Latest permit
Mar 13, 2006
Wells and acres on the permits for Schultz 696
API numberWell no.Acreson the permit
42-295-329945H624

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says SCHULTZ 696 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for SCHULTZ 696
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Highmark Energy003922950$80.46$2.89
Jun 2026Highmark Energy003963020$84.81$3.15
May 2026Highmark Energy1605804830$102.13$2.94
Apr 2026Highmark Energy00105110$100.32$2.77
Mar 2026Highmark Energy002571600$91.38$3.04
Feb 2026Highmark Energy1702251380$64.51$3.62
Jan 2026Highmark Energy004343370$60.04$7.72
Dec 2025Highmark Energy004163190$57.97$4.26
Nov 2025Highmark Energy2904533590$60.06$3.79
Oct 2025Highmark Energy2804683710$60.89$3.19
Sep 2025Highmark Energy4804603660$63.96$2.97
Aug 2025Highmark Energy701894913940$64.86$2.91
Jul 2025Highmark Energy671754963990$68.39$3.20
Jun 2025Highmark Energy2503832890$68.17$3.02
May 2025Highmark Energy7104653680$62.17$3.12
Apr 2025Highmark Energy904403460$63.54$3.42
Mar 2025Highmark Energy5504853880$68.24$4.12
Feb 2025Highmark Energy2105164290$71.53$4.19
Jan 2025Highmark Energy7705224250$75.74$4.13
Dec 2024Highmark Energy006015040$70.12$3.01
Nov 2024Highmark Energy006315370$69.95$2.12
Oct 2024Highmark Energy00154570$71.99$2.20
Sep 2024Highmark Energy00186920$70.24$2.28
Aug 2024Highmark Energy003042070$76.68$1.99
Jul 2024Highmark Energy120158610$81.80$2.07
Jun 2024Highmark Energy00144500$79.77$2.54
May 2024Highmark Energy5005074100$80.02$2.12
Apr 2024Highmark Energy1004293350$85.35$1.60
Mar 2024Highmark Energy805304330$81.28$1.49
Feb 2024Highmark Energy504924020$77.25$1.72
Jan 2024Highmark Energy3006535560$74.15$3.18
Dec 2023Highmark Energy002131160$71.90$2.52
Nov 2023Highmark Energy673462111170$77.69$2.71
Oct 2023Highmark Energy9106435460$85.64$2.98
Sep 2023Highmark Energy004563620$89.43$2.64
Aug 2023Highmark Energy003052080$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for SCHULTZ 696. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Highmark Energy Operating, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Highmark Energy Operating, LLC in Lipscomb County

All Highmark Energy Operating, LLC leases →

Lipscomb (Cleveland) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 218771, district 10, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.

FAQ

Questions about SCHULTZ 696

Who operates the SCHULTZ 696 lease?

The Railroad Commission lists Highmark Energy Operating, LLC (operator number 385847) as the operator of this lease in Lipscomb County, Texas. The operator history on this page shows earlier operators and when the record changed.

How much has the SCHULTZ 696 lease produced?

The lease reported 208 bbl of oil and 4,677 mcf of gas in the last 12 months through Jul 2026. Monthly figures for 36 months are in the ledger on this page, taken from the Railroad Commission's production data.

Does this page show who owns the royalty?

No. Railroad Commission records show who operates a lease and what it reported, not who owns the minerals or receives royalty. Your division order and royalty stub name the lease and your decimal interest.

How do I check my royalty stub against this lease?

Multiply the lease's volume for a month by your decimal interest and compare it with the barrels and mcf on your stub for the same month. The two are seldom identical, since sales and reporting months can differ, but a large gap is worth a question to the operator.

Check my statement