Texas oil leaseRRC 02-09790Producing
Stone Unit A
One well on 360 acres in Karnes County, and four more on the way. The lease produced 204,983 barrels of oil in the last 12 months, through August 2026.
- Operator
- Burlington Resources O & G Co LP
- County
- Karnes
- On record since
- November 2011
- Newest report on file
- August 2026
- Unit on the newest permit
- 360 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
The story, from 178 monthly reports
On record since November 2011
November 2011: the first month the lease sold oil on record, 1,862 barrels.
January 2025: three new wells were completed on the lease.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, November 2011 through August 2026. Not a forecast, not reserves.
178 months against 7 other recordsNew
Every month since November 2011, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Oil averaged $68.39 a barrel · Burlington Resources O & G Co LP
- No public record explains this drop.
Move the pointer or drag across the chart. The numbered buttons jump to each drop.
Monthly oil sold from this lease since November 2011, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 178 months from November 2011 to August 2026. The most in one month: 112,658 barrels, March 2025. The newest month: 10,919 barrels. 1 month with nothing reported. Moments marked: 1, May 2012; 2, Sep 2012; 3, Jan 2013; 4, Dec 2013; 5, May 2017; 6, Nov 2019; 7, Jan 2021; 8, Jul 2025.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease
175 months, one line eachNew
No silent months since November 2011
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
runs of two or more months with nothing reported, since November 2011.
barrels of oil and 25,162 thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.
of 175 months with oil or gas reported since November 2011.
barrels of oil a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, November 2011 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease
16 years of state records, 2011 to 2026
Sold since November 2011
$119million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 1,653,484barrels
- Gas sold
- 2,442,896thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2011 | $181,000 | Unavailable | $181,000 in priced filings |
| 2012 | $11.2 million | $350,000 | $11.5 million |
| 2013 | $4.97 million | $279,000 | $5.25 million |
| 2014 | $10 million | $492,000 | $10.5 million |
| 2015 | $9.36 million | $640,000 | $10 million |
| 2016 | $4.97 million | $487,000 | $5.46 million |
| 2017 | $4.41 million | $426,000 | $4.83 million |
| 2018 | $5.58 million | $433,000 | $6.01 million |
| 2019 | $2.7 million | $194,000 | $2.89 million |
| 2020 | $1.35 million | $99,400 | $1.45 million |
| 2021 | $2.18 million | $116,000 | $2.3 million |
| 2022 | $2.63 million | $186,000 | $2.82 million |
| 2023 | $1.73 million | $42,500 | $1.77 million |
| 2024 | $1.33 million | $35,700 | $1.37 million |
| 2025 | $39.6 million | $3.31 million | $42.9 million |
| 2026, 2026 so far | $8.46 million | $908,000 | $9.37 million |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since November 2011. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
New wells, seen from the sideNew
The completion of well 5 was filed 662 days ago
The frac registry reports weeks before the State's completion papers do. This is the well itself, 3.3 miles down and 1.1 miles out, and where it stands today.
days since the
completion was filed9 days of pumping
- Permit filednot on file
- Drilling startednot started
- FrackedDec 9 to 17
- Completion filedJanuary 28, 2025
- First productionnot reported yet
- First checkdue by May 31, 2025
SourcesPermits, depth and bottom hole: Railroad Commission of Texas. Frac dates and water: FracFocus chemical disclosure registry. Source records through November 16, 2026.
Royalty Watch tells you the day a well here moves to its next stage.Watch this lease
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
Five wells on this lease
| Well | API number | Completed | Sidewaysfeet | Depthfeet | Today |
|---|---|---|---|---|---|
| 1 | 42-255-31893 | May 2011 | 5,773 | 11,928 | Active |
| 2 | 42-255-33576 | September 2014 | 6,242 | 12,001 | Permit approved |
| 3 | 42-255-37992 | January 2025 | 5,580 | 11,933 | Completed, waiting |
| 4 | 42-255-37993 | January 2025 | 6,138 | 11,951 | Completed, waiting |
| 5 | 42-255-37994 | January 2025 | 5,966 | 12,005 | Completed, waiting |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
360acres on the newest permit
- 401 acres, on the 2011 permits
- 360 acres, on the 2024 to 2025 permits
The acres changed between permits. 401 acres, on the 2011 permits; 360 acres, on the 2024 to 2025 permits. When a unit changes, every owner’s decimal is figured again.
Oil, August 2026, dollars per barrel New
Four prices for the same oil
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
No lower tax approval on file
- Usual oil rate
- 4.60%
- Usual gas rate
- 7.50%
No lower tax approval appears for this lease in the two years covered by the Comptroller’s list as of October 1, 2026.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$5,290a month
At these prices the whole lease’s reported sales were about $16.3 million over 12 reported months. Your estimated share is $63,500 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 42.6523 | $3,578.53 | 98.2891 | $273.24 | $3,851.78 |
| July 2026 | 27.5625 | $2,217.68 | 105.4766 | $304.83 | $2,522.51 |
| June 2026 | 40.8594 | $3,465.28 | 101.457 | $319.59 | $3,784.87 |
| May 2026 | 51.1055 | $5,219.40 | 110.6641 | $325.35 | $5,544.75 |
| April 2026 | 49.7109 | $4,987.00 | 106.6953 | $295.55 | $5,282.55 |
| March 2026 | 58.5039 | $5,346.09 | 129.6758 | $394.21 | $5,740.30 |
| February 2026 | 58.6836 | $3,785.68 | 130.0898 | $470.93 | $4,256.60 |
| January 2026 | 74.0703 | $4,447.18 | 150.4453 | $1,161.44 | $5,608.62 |
| December 2025 | 82.9766 | $4,810.15 | 158.3828 | $674.71 | $5,484.86 |
| November 2025 | 82.1328 | $4,932.90 | 173.2266 | $656.53 | $5,589.43 |
| October 2025 | 108.418 | $6,601.57 | 194.7227 | $621.17 | $7,222.74 |
| September 2025 | 124.0391 | $7,933.54 | 223.0195 | $662.37 | $8,595.91 |
SourcesMarket: U.S. Energy Information Administration (WTI Cushing for oil; Henry Hub for gas, taken per thousand cubic feet). Investors: ConocoPhillips, Form 10-Q, Q3 2026, company-wide. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
The oil gatherer and the operator have one owner
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
same owner at both ends of the sale
same owner at both ends of the sale
Selling to a related company is common and legal. It is also the first thing an auditor looks at, because the price between the two is set inside one company.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| NGL CRUDE LOGISTICS, LLC | Oil | Gathers | Jul 2014 | Jan 2025 |
| FLINT HILLS RESOURCES, LP | Oil | Gathers | Jun 2013 | Jan 2025 |
| CONOCOPHILLIPS COMPANY | Oil | Gathers | Jun 2013 | Jan 2025 |
| BP PRODUCTS NORTH AMERICA INC. | Oil | Gathers | Jun 2013 | Jan 2025 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
Over 99% of the gas went to a processing plant in the last 12 months
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Processing plant (3)100% · 430,629 mcf
- Lease fuel (1)0.2% · 890 mcf
SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.
Karnes County Appraisal District, 2026 mineral roll
9 royalty accounts on the county roll
- Owners
- 10
- Accounts
- 10
- Appraised in all
- $11M$11,139,720
Is one of these yours?
Each square is one account
- Royalty 9
- Working interest 1
SourceKarnes County Appraisal District, 2026 mineral roll (source), read September 29, 2026. Accounts matched to this lease by RRC number or lease name.
From the state record
What owners ask about Stone Unit A
- 01When is the check for August 2026 due?
- Aug 31sale month endsOct 30oil dueNov 29gas due
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Gas7.50%Oil4.60%
- The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil and 7.5% on gas applies.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- OILConocophillips Company100%GASConocophillips Company100%
- Oil: Conocophillips Company gathers it. Gas from oil wells: Conocophillips Company buys it; Burlington Resources O & G CO LP gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, Burlington Resources O & G Co LP, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
178 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices |
|---|---|---|---|---|
| AugustAug 2026 | 10,919 | 25,162 | 0 | $986,000 |
| JulyJul 2026 | 7,056 | 27,002 | 0 | $646,000 |
| JuneJun 2026 | 10,460 | 25,973 | 0 | $969,000 |
| MayMay 2026 | 13,083 | 28,330 | 0 | $1.42 million |
| AprilApr 2026 | 12,726 | 27,314 | 0 | $1.35 million |
| MarchMar 2026 | 14,977 | 33,197 | 0 | $1.47 million |
| FebruaryFeb 2026 | 15,023 | 33,303 | 0 | $1.09 million |
| JanuaryJan 2026 | 18,962 | 38,514 | 0 | $1.44 million |
| DecemberDec 2025 | 21,242 | 40,546 | 0 | $1.4 million |
| NovemberNov 2025 | 21,026 | 44,346 | 0 | $1.43 million |
| OctoberOct 2025 | 27,755 | 49,849 | 0 | $1.85 million |
| SeptemberSep 2025 | 31,754 | 57,093 | 0 | $2.2 million |
| AugustAug 2025 | 36,196 | 68,411 | 0 | $2.55 million |
| JulyJul 2025 | 39,542 | 80,369 | 0 | $2.96 million |
| JuneJun 2025 | 50,809 | 102,037 | 0 | $3.77 million |
| MayMay 2025 | 74,286 | 130,124 | 0 | $5.02 million |
| AprilApr 2025 | 69,833 | 108,477 | 0 | $4.81 million |
| MarchMar 2025 | 112,658 | 144,369 | 0 | $8.28 million |
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Likely owed Jan 2025
A whole month was never paid
The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.
Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?
$2,277oil + gas
A sample finding, from our example check. The full example found $3,328 likely owed.
Around this lease
Nearby
Burlington Resources O & G Co LP in Karnes County
- Ruck-Col-Brown Ulw A230,533 bbl last 12 months
- Metz-Korth-Rru Usw B209,520 bbl last 12 months
- Metz-Korth-Rru Usw D208,636 bbl last 12 months
- Paw-Escond-Mix Usw G189,351 bbl last 12 months
- McElveen Unit A182,277 bbl last 12 months
- Escondido A B Usw E182,068 bbl last 12 months
- Metz-Korth Usw B186,799 bbl last 12 months
- Yanta N-Tennant Usw A185,228 bbl last 12 months
- Korth South Unit A175,475 bbl last 12 months
- Escondido A B Usw F166,051 bbl last 12 months
Eagleville (Eagle Ford-2) field
- Hamilton A-Kickendahl Unit 1 Sa61,222,430 mcf last 12 months
- Douglas-Bensmiller Usw B202,057 bbl last 12 months
- Metz-Korth-Rru Usw B209,520 bbl last 12 months
- Blackwell A-Oehlke A Sa 41,473,737 mcf last 12 months
- Jog Unit215,057 bbl last 12 months
- Warzecha Bor D Usw A202,014 bbl last 12 months
- Meeks Fordyce A210,646 bbl last 12 months
- Metz-Korth-Rru Usw D208,636 bbl last 12 months
- Napoo B462,968 mcf last 12 months
- Hamilton A-D. Warzecha A Sa 71,588,805 mcf last 12 months
Leases within 10 km
- Busselman Unit A35,173 bbl last 12 months · 0.1 km
- JJJ Ranch-Sisti Ulw6,742 bbl last 12 months · 0.4 km
- JJJ Ranch Unit A106,161 bbl last 12 months · 0.4 km
- Flying Horse Unit A3,221 bbl last 12 months · 0.4 km
- Flying-Forister-Hickok Usw B14,174 bbl last 12 months · 1.6 km
- Flying-Forister-Hickok Usw A14,937 bbl last 12 months · 1.6 km
- Hickok-Flying Horse Usw A11,184 bbl last 12 months · 1.6 km
- Hickok Unit A51,088 bbl last 12 months · 1.6 km
- Johnson-Flying Horse Usw23,209 bbl last 12 months · 1.6 km
- Karnes City NW Unit42,181 bbl last 12 months · 1.7 km
Drilling permits within 10 km
- MARGARET UNIT 2-PETERSON C #101Hnew drill · horizontal · Silver Hill Energy Operating LLC · Nov 13, 2026 · 4.9 km
- MARGARET UNIT 2-PETERSON C #002Hnew drill · horizontal · Silver Hill Energy Operating LLC · Nov 13, 2026 · 4.9 km
- MARGARET UNIT 1 #102Hnew drill · horizontal · Silver Hill Energy Operating LLC · Nov 12, 2026 · 5 km
- MARGARET UNIT 1-PETERSON E #201Hnew drill · horizontal · Silver Hill Energy Operating LLC · Nov 12, 2026 · 5 km
- MARGARET UNIT 1-PETERSON D #003Hnew drill · horizontal · Silver Hill Energy Operating LLC · Nov 12, 2026 · 5 km
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- SEC EDGAR company filings
- FracFocus frac dates
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- Karnes County Appraisal District mineral roll
- U.S. Geological Survey photos