Skip to content
Royalty Clerk

Texas gas well

No report in 6+ months

STUART, J. N.

Stuart, J. N. is a gas well in Palo Pinto County, Texas, operated by GTG Operating, LLC in the Stuart (Marble Falls 3500) field.

1 well

3mcf gas, last 12 months
RRC lease
7B-196892

Is your check right?

Check my statement

Where it sits

This county

Palo Pinto CountyPalo PintoWiseJackHoodStephensParkerYoungPalo Pinto County
Palo Pinto County
Gas in Aug 2023
1 mcf
Reporting since
Jan 2020

Production by month

Gas output over the last 12 months

  • Gas (bars)
  • Last 12 months
Gas output over the last 12 monthsMonthly gas production for STUART, J. N., Sep 2020 to Aug 2023. Gas output over the last 12 months. 3 mcf in the 12 months through Aug 2023, against 0 mcf in the 12 months before.Last 12 months: 3 mcfmcf per month00111Oct 20Jan 21AprJulOctJan 22AprJulOctJan 23AprJul
Gas output over the last 12 monthsMonthly gas production for STUART, J. N., Sep 2020 to Aug 2023. Gas output over the last 12 months. 3 mcf in the 12 months through Aug 2023, against 0 mcf in the 12 months before.Last 12 monthsmcf per month00111Jan 21JulJan 22JulJan 23Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

All of the gas went to lease fuel in the 3 months reported

All of the gas went to lease fuel in the 3 months reportedShare of STUART, J. N. gas by disposition code each month, Sep 2020 to Aug 2023. All of the gas went to lease fuel in the 3 months reported.Share of the lease’s gas by disposition code, per month0%50%100%Oct 20Jan 21AprJulOctJan 22AprJulOctJan 23AprJul
All of the gas went to lease fuel in the 3 months reportedShare of STUART, J. N. gas by disposition code each month, Sep 2020 to Aug 2023. All of the gas went to lease fuel in the 3 months reported.Share of gas by disposition code0%50%100%Jan 21JulJan 22JulJan 23Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Who has run this lease

The operator changed once, most recently in May 2020

Operators of this lease over timeTessara Petroleum Resources, LLC, Jan 2020 to Apr 2020; GTG Operating, LLC, May 2020 to Aug 20232020202120222023Changed May 2020Tessara Petroleum Resources,…Jan 2020 to Apr 2020GTG Operating, LLCMay 2020 to now
Operators of this lease over timeTessara Petroleum Resources, LLC, Jan 2020 to Apr 2020; GTG Operating, LLC, May 2020 to Aug 20232020202120222023Changed May 2020Tessara Petroleum Resources, LLCJan 2020 to Apr 2020GTG Operating, LLCMay 2020 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on STUART, J. N.
API numberWell no.Status
42-363-00266167Shut-in

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Sentinel Transportation, LLCCondensateGathers100Sep 3, 2003
Ranger Gas Gathering, L.l.c.Gas-well gasBuys100May 1, 2014
Ranger Gas Gathering, L.l.c.Gas-well gasGathers100May 1, 2014

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

What the drilling permits say

Permits for Stuart, J. N.
API numberWell no.Acreson the permit
42-363-00266167–

SourceRailroad Commission drilling permits, Sep 26, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for STUART, J. N.
MonthGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Aug 2023GTG Operating,100$81.39$2.58
Jul 2023GTG Operating,100$76.07$2.55
Jun 2023GTG Operating,100$70.25$2.18
May 2023GTG Operating,000$71.58$2.15
Apr 2023GTG Operating,000$79.45$2.16
Mar 2023GTG Operating,000$73.28$2.31
Feb 2023GTG Operating,000$76.83$2.38
Jan 2023GTG Operating,000$78.12$3.27
Dec 2022GTG Operating,000$76.44$5.53
Nov 2022GTG Operating,000$84.37$5.45
Oct 2022GTG Operating,000$87.55$5.66
Sep 2022GTG Operating,000$84.26$7.88
Aug 2022GTG Operating,000$93.67$8.81
Jul 2022GTG Operating,000$101.62$7.28
Jun 2022GTG Operating,000$114.84$7.70
May 2022GTG Operating,000$109.55$8.14
Apr 2022GTG Operating,000$101.78$6.60
Mar 2022GTG Operating,000$108.50$4.90
Feb 2022GTG Operating,000$91.64$4.69
Jan 2022GTG Operating,000$83.22$4.38
Dec 2021GTG Operating,000$71.71$3.76
Nov 2021GTG Operating,000$79.15$5.05
Oct 2021GTG Operating,000$81.48$5.51
Sep 2021GTG Operating,000$71.65$5.16
Aug 2021GTG Operating,000$67.73$4.07
Jul 2021GTG Operating,000$72.49$3.84
Jun 2021GTG Operating,000$71.38$3.26
May 2021GTG Operating,000$65.17$2.91
Apr 2021GTG Operating,000$61.72$2.66
Mar 2021GTG Operating,000$62.33$2.62
Feb 2021GTG Operating,000$59.04$5.35
Jan 2021GTG Operating,000$52.00$2.71
Dec 2020GTG Operating,000$47.02$2.58
Nov 2020GTG Operating,000$40.94$2.61
Oct 2020GTG Operating,000$39.40$2.39
Sep 2020GTG Operating,000$39.63$1.92

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Sep 28, 2026.

How to check your stub against this lease

Do your checks match this lease?

Nearby

GTG Operating, LLC in Palo Pinto County

No other producing leases from this operator in this county are in our data yet.

Stuart (Marble Falls 3500) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km