Texas operatorRRC operator 357762Active
Harper Production, LLC
Harper runs 3 producing leases in Ochiltree County. They sold 237 barrels of oil in the last 12 months, through July 2026.
- Producing leases
- 3
- Counties
- 1
- Biggest county
- Ochiltree
- Biggest field
- Kiowa Creek (Marmaton)
- First report
- June 2009
- Newest month
- July 2026
The story, from 206 months of reports
How Harper Production's gas fell, then rose again
Harper Production works three producing leases, all in Ochiltree County. Gas made more of its output than oil in every full calendar year from 2020 to 2025.
Its gas fell from 6,100 mcf in 2020 to 1,439 mcf in 2024, then rose to 3,440 mcf in 2025. Oil fell from 469 barrels in 2022 to 199 barrels in 2023. All of its gas in the last 12 months went to a gas line.
The oldest of its leases is Guipel, whose first month on file is February 1994. DCP Operating Company, LP is the main buyer on 3 of its leases.
Not a forecast, not reserves.
206 months against six other recordsNew
Every month since Harper's first report, and what else happened that month
All of its leases added together are the line on top. Under it, on the same clock: the weather, the price, how many leases it ran, takeovers, the State and its buyers. Move across it.
Oil averaged $59.04 a barrel · 3 leases reporting
- WeatherExtreme cold/wind chill, February 14 to 15, 2021. Two days below 20°F in Ochiltree County.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly production of all Harper Production, LLC leases, with the records of the same months beneath it. 206 months from June 2009 to July 2026. The most in one month: 172 barrels, July 2016. The newest month: 40 barrels. 92 months with nothing reported. Moments marked: 1, Feb 2021; 2, Feb 2022; 3, Feb 2024; 4, Aug 2024; 5, Mar 2025.
SourcesProduction, leases, takeovers, cut-offs and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration (West Texas Intermediate a barrel and Henry Hub per million Btu). Operator 357762, through July 2026, file dated Oct 20, 2026. A record in the same month is not proof of a cause.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
Every producing lease, drawn to size
Its three producing leases, biggest first
The box is the one lease of Harper that sold oil in the last 12 months; 2 more leases sold only gas and have no box. Its size is the oil it sold in the last 12 months. Its colour says whether that is more or less than the 12 months before. Tap it to see the lease in the list.
| County | Field | barrels produced, 12 reports | on the 12 before | 24 months | Also on record | |
|---|---|---|---|---|---|---|
| Mason | Ochiltree | Kiowa Creek (Marmaton) | 237 | ▲ 59.1% | Nothing else | |
| Santa Fe | Ochiltree | Just Skill (Lower Morrow -C-) | 2,444mcf | ▲ 86.9% | 6 silent months, 2024 | |
| Guipel | Ochiltree | Skill Again (Lower Morrow -B-) | 1,099mcf | ▲ 87.2% | 6 silent months, 2024Lower tax |
SourceTexas Railroad Commission Production Data Query, operator 357762, through July 2026.
When leases change handsNew
2 leases changed hands. One went quiet.
A new operator has to set up every owner again before it can pay. A lease that also stops reporting is the one to watch: many leases end after 60 to 90 days without production unless the lease says otherwise.
of the 2 leases taken over in June 2009 reported nothing for two months or more in the year after.
of the 2 never missed a month.
A gap in the State’s record is not a missed payment by itself. Wells are often worked on after a takeover. It is the month to check against your own stubs.
SourceRailroad Commission production reports and operator of record by month. A lease counts as taken over when the operator of record changes from one month to the next and the operator before it reported within the year.
Royalty Watch tells you the month your lease gets a new operator, and what to send them.See Royalty Watch
Prices and tax, July 2026New
The State approved a lower tax on 1 of its 3 leases
The market price is the public benchmark. The price on your statement is the one to set beside it, and the tax line beside the rate the State approved.
The State approved a lower tax on 1 of its 3 leases
- LOW PRODUCING WELLS
- 1 lease
- Newest approval
- February 2013
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
Check the tax on your stubSourcesMarket: U.S. Energy Information Administration, July 2026 (West Texas Intermediate a barrel). Tax approvals: Texas Comptroller. Leases sell at different points and qualities, so prices differ for ordinary reasons too. Comptroller tax approval source date unavailable.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
Dcp Operating Company, LP takes 100% of its gas
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing, for its 2 leases.
- Dcp Operating Company, LP100%2 leases
No shared owner, officer or address on record between the gas buyers and the operator.
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, weighted by each lease’s sales. Ownership: U.S. Securities and Exchange Commission filings and Railroad Commission P-5 records. Each buyer’s link is its own: a parent, officer or address shared by one buyer is never read onto another. Newest P-4 record effective April 1, 2017.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No repeat heat matched to this operator's leases in the records read
NOAA's VIIRS instruments record hot spots at night on the passes they make over Texas, when cloud does not hide the ground. In the readings read here for 2025, no spot that repeated near the located wells of Harper's leases was matched to one of them. That is not a finding that its pads had no heat: a lease is looked at only where its wells have a location on file, and cloud and missed passes hide nights. A location alone does not show that the satellites saw its wells. No flaring report was matched at the leases included in the comparison for 2025. That is not a finding that it reported none: a lease with no well location on file is not compared, and a month with no report read is not counted.
lease-nights of repeat heat matched to Harper's leases in the satellite records read for 2025: not proof of no heat, since only clear nights on the passes read are seen.
lease-month with flaring reported at the leases included in the comparison, January to December 2025. Not a count for the operator: a lease with no well location on file is not compared, and a month with no report read is not counted as a report.
Where the gas from all its leases went, Aug 2025 to Jul 2026, as Harper reported it to the Railroad Commission
SourcesHeat: NOAA VIIRS night detections (375 m) within 500 m of a lease's located wells, counted only where the spot repeats on several nights; GOES-East readings never establish a night. Reported flaring and gas use: Railroad Commission production reports, by disposition code (what the codes mean). Cloud, missed passes and days missing from the readings hide nights, so a count of nights or lease-nights is a floor and no heat matched is not proof of none. The satellite records heat. It does not say what burned. Flaring set beside the heat (disposition code 4) is counted only at the leases included in the comparison, January to December 2025; a lease with no well location on file is not compared, and a month with no report read for a lease is not counted as a report. The gas use shares count all its leases, August 2025 to July 2026. Nights counted for January to December 2025; satellite readings read here run from February 22, 2024 through November 17, 2026. Production report file dated October 20, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Permits, drilling and fracsNew
Wells between permit and first production
The State's permit list, as read here, holds no drilling permit for Harper. The dates its wells were drilled, fracked and first produced are not on file here, so this page cannot say whether a well is on the way.
SourcesPermits, drilling dates and completions: Railroad Commission of Texas. Frac dates: FracFocus chemical disclosure registry. Permit list dated November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
On file with the Railroad Commission of Texas
Harper Production, LLC address and phone number
- Organization
- Harper Production, LLC
- Operator number
- 357762
- Status
- Active
- Mailing address
- PO Box 424
Spearman, TX 79081 - Phone
- (806) 330-0273
- Last filing received
- Jun 3, 2026
- Leases on record
- 3, of which 3 producing
- First production report
- June 2009
- Railroad Commission district
- 10
- Organization type
- Limited liability company (code not in the RRC's 2014 layout; inferred from the names)
This is the address of record with the State. It can be a regulatory office and not the desk that pays royalties.
SourceRailroad Commission of Texas, organization (P-5) file. Record dated October 22, 2026. No address is shown for a person who operates under their own name. Royalty Clerk is not affiliated with Harper Production, LLC.
From the state record
What owners ask about Harper
- 01Did Harper take over my lease from another company?
- 2 leases1 leaseJun 2009Jun 2009May 2016Jul 2026
- 2 of its 3 producing leases came from another operator. The biggest takeovers: 2 from Athena Energy, Inc. in June 2009; 1 from Chi Operating, Inc. in May 2016. Each lease page shows who ran the lease in every month back to January 1993.
- Source: Railroad Commission production reports, operator of record by month.
- See the one that went quiet
- 02When is the check for July 2026 due?
- Jul 31sale month endsSep 29oil dueOct 29gas dueTODAY, NOV 20
- July 2026 is the newest month the State has posted for Harper's leases. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by September 29, 2026 and the gas by October 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 03Who buys what Harper produces?
- GASDcp Operating Company, LP100%
- Most of the gas goes to Dcp Operating Company, LP. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer
- 04Do Harper's leases pay the full production tax?
- Gas, full rate, 2 leases7.50%Gas, lower rate, 1 leaseOil, all 3 leases4.60%
- The Comptroller lists an approved lower tax on 1 of the 3 producing leases: 1 for lOW PRODUCING WELLS. On the others the full 7.50% for gas and 4.60% for oil apply.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 05How much has the gas output changed since 2020?
- Gas was 6,100 mcf in 2020, 1,439 mcf in 2024 and 3,440 mcf in 2025. All 3,543 mcf of its gas in the last 12 months went to a gas line. Oil was 405 barrels in 2020 and 178 barrels in 2025.
- 06Who buys the gas and oil from these leases?
- DCP Operating Company, LP is the main buyer on 3 of its leases. Its three producing leases are all in Ochiltree County, across three fields.
- Who buys my oil and gas?
- 07Which fields does this operator produce from?
- Just Skill (Lower Morrow -C-) produced 2,444 mcf of gas in the last 12 months. Skill Again (Lower Morrow -B-) produced 1,099 mcf of gas. Kiowa Creek (Marmaton) produced 237 barrels of oil.
- 08How old is the oldest lease it runs?
- Guipel is its oldest producing lease, and its first month on file is February 1994. The state's monthly history for each lease goes back to January 1993.
From the State’s records through July 2026.
Do your Harper checks match the State?
Paid by Harper? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this operator
Nearby
Other operators in Ochiltree County
- Mewbourne Oil Company650K bbl, 12 months
- Capturepoint LLC513K bbl, 12 months
- Courson Oil & Gas, Inc.266K bbl, 12 months
- Presidio Petroleum LLC120K bbl, 12 months
- High River Res Operating, LLC141K bbl, 12 months
Counties where Harper works
- Ochiltree County3 Harper leases
Fields where Harper works
- Kiowa Creek (Marmaton)1 Harper lease
- Just Skill (Lower Morrow -C-)1 Harper lease
- Skill Again (Lower Morrow -B-)1 Harper lease
Related pages
- Ochiltree CountyAll three of its producing leases are in this county.
- GuipelIts oldest producing lease, with first month on file February 1994.
- Just Skill (Lower Morrow -C-)Its largest gas field in the last 12 months, at 2,444 mcf.
- Kiowa Creek (Marmaton)Its only oil field in the last 12 months, at 237 barrels.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, Form P-5, permits, wells
- Texas Comptroller tax approvals, lease prices
- U.S. Energy Information Administration prices
- SEC EDGAR company filings
- FracFocus frac dates
- NOAA storms and cold
- NOAA VIIRS night heat
- U.S. Census Bureau county shapes