Skip to content
Royalty Clerk

Texas oil lease

Producing

LIMBER PINE A3

Limber Pine A3 is an oil lease in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field.

2 wells

24,922bbl oil, last 12 months+4% vs prior year
RRC lease
08-56307

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Gas, last 12 months
39,804 mcf
Oil in Jul 2026
2,158 bbl

Production by month

Oil output rose 4% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output rose 4% over the last 12 monthsMonthly oil production and gas for LIMBER PINE A3, Aug 2023 to Jul 2026. Oil output rose 4% over the last 12 months. 24,922 bbl in the 12 months through Jul 2026, against 23,940 bbl in the 12 months before.Last 12 months: 24,922 bblbbl per monthmcf per month002,0002,5004,0005,0006,0007,5008,00010k10k12.5kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 4% over the last 12 monthsMonthly oil production and gas for LIMBER PINE A3, Aug 2023 to Jul 2026. Oil output rose 4% over the last 12 months. 24,922 bbl in the 12 months through Jul 2026, against 23,940 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002,0002,5004,0005,0006,0007,5008,00010k10k12.5kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant

Flaring peaked at 40.7% of the gas in Dec 2023.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of LIMBER PINE A3 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 40.7% of the gas in Dec 2023.Share of the lease’s gas by disposition code, per month0%50%100%Aug 2024: plant to lineFlared 40.7%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of LIMBER PINE A3 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 40.7% of the gas in Dec 2023.Share of gas by disposition code0%50%100%Aug 24: plant to lineFlared 40.7%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    98% · 38,875 mcf

  • Lease fuel (1)

    1.2% · 489 mcf

  • Flared (4)

    1.1% · 440 mcf

1.1% of the gas flared in the last 12 months. 8 months above 3%.

Who has run this lease

The operator changed once, most recently in Aug 2024

Operators of this lease over timeCallon Petroleum Operating Co, Apr 2021 to Jul 2024; Apache Corporation, Aug 2024 to Jul 202620222023202420252026Changed Aug 2024Callon Petroleum Operating CoApr 2021 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, Apr 2021 to Jul 2024; Apache Corporation, Aug 2024 to Jul 202620222023202420252026Changed Aug 2024Callon Petroleum Operating CoApr 2021 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

2 wells on this lease

Wells on LIMBER PINE A3
API numberWell no.Status
42-475-378289UAActive
42-475-3783216HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Medallion Operating Company, LLCOilGathers50Jan 1, 2025–
Plains Pipeline L.p.OilGathers50Jan 1, 2025–
Brazos Midstream Operating, LLCCasinghead gasBuys100Apr 21, 2021–
Brazos Midstream Operating, LLCCasinghead gasGathers100Apr 21, 2021–
Medallion Operating Company, LLCOilGathers90Apr 21, 2021Jan 1, 2025
Rio Energy International, Inc.OilGathers10Apr 21, 2021Jan 1, 2025

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,295.51 acres on the newest permit

An allocation well is on this lease

Permits for Limber Pine A3
API numberWell no.Acreson the permit
42-475-378289UA1,295.51
42-475-3783216H1,295.51

SourceRailroad Commission drilling permits, Sep 26, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for LIMBER PINE A3
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Apache Corporation2,1582,2354,8844,78599$80.46$2.89
Jun 2026Apache Corporation3,0603,0005,4355,100335$84.81$3.15
May 2026Apache Corporation2,9562,9495,3305,3300$102.13$2.94
Apr 2026Apache Corporation2,9262,9916,5966,5960$100.32$2.77
Mar 2026Apache Corporation4,1124,1206,4166,4160$91.38$3.04
Feb 2026Apache Corporation2,5312,4793,6033,4080$64.51$3.62
Jan 2026Apache Corporation1,3811,3341,5171,4070$60.04$7.72
Dec 2025Apache Corporation1,2371,2116495671$57.97$4.26
Nov 2025Apache Corporation8027968538030$60.06$3.79
Oct 2025Apache Corporation9279491,2431,1855$60.89$3.19
Sep 2025Apache Corporation1,2661,2891,5511,5510$63.96$2.97
Aug 2025Apache Corporation1,5661,5561,7271,7270$64.86$2.91
Jul 2025Apache Corporation1,9221,8762,2752,2750$68.39$3.20
Jun 2025Apache Corporation5144721,0191,0190$68.17$3.02
May 2025Apache Corporation424052484$62.17$3.12
Apr 2025Apache Corporation056000$63.54$3.42
Mar 2025Apache Corporation5655091,2401,2400$68.24$4.12
Feb 2025Apache Corporation0213000$71.53$4.19
Jan 2025Apache Corporation2,5382,5433,3193,1520$75.74$4.13
Dec 2024Apache Corporation4,1184,0774,8464,6170$70.12$3.01
Nov 2024Apache Corporation3,4403,4435,6155,41320$69.95$2.12
Oct 2024Apache Corporation3,7383,6735,8775,59274$71.99$2.20
Sep 2024Apache Corporation3,5143,5716,0175,97833$70.24$2.28
Aug 2024Apache Corporation3,5493,5666,0875,834248$76.68$1.99
Jul 2024Callon Petroleum4,6864,6678,2917,853252$81.80$2.07
Jun 2024Callon Petroleum4,3994,3508,3398,051118$79.77$2.54
May 2024Callon Petroleum4,2514,2538,5548,104318$80.02$2.12
Apr 2024Callon Petroleum3,5013,5177,1757,0550$85.35$1.60
Mar 2024Callon Petroleum5,1925,2169,9538,3821,410$81.28$1.49
Feb 2024Callon Petroleum5,0115,1319,0678,191668$77.25$1.72
Jan 2024Callon Petroleum6,5396,46710,2169,92737$74.15$3.18
Dec 2023Callon Petroleum7,6867,62010,8606,2094,423$71.90$2.52
Nov 2023Callon Petroleum2,8752,9563,2003,1303$77.69$2.71
Oct 2023Callon Petroleum5,9725,9317,7467,4540$85.64$2.98
Sep 2023Callon Petroleum6,1726,1778,8928,6070$89.43$2.64
Aug 2023Callon Petroleum6,8136,7679,6989,3980$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Sep 28, 2026.

How to check your stub against this lease

Do your checks match this lease?

Nearby

Apache Corporation in Ward County

All Apache Corporation leases →

Leases within 10 km

Drilling permits within 10 km