Skip to content
A-1203 · SEC. 112 · BLK 34 · H&TC RR COA-233 · SEC. 110 · BLK 34 · H&TC RR CO9UAA-1203SEC. 112 · BLK 34 · H&TC RR COA-233SEC. 110 · BLK 34 · H&TC RR COSHORTLEAF A2 · 327 ACRESN1 mile31.4683° N 103.1898° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas oil leaseRRC 08-59761

Shortleaf A2

One well on 327 acres in Ward County. The lease produced 25,648 barrels of oil in the last 12 months, through August 2026.

14 royalty accounts on the county roll

Is your family on this lease?

Email me when this lease changesI own here

County
Ward
On record since
April 2023
Newest report on file
August 2026
Unit on the newest permit
327 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 41 monthly reports

2023 to 2026: it sold the most in 2023

Oil sold each month since April 2023The numbers match the paragraphs below
2024202520261Apr 2023220233Aug 20244August 2026Apr 2023 onward

April 2023: the first month the lease sold oil on record, 11,418 barrels.

2023: the year the lease sold the most, $7.21 million of oil and gas at public prices.

August 2024: Apache Corporation took over from Callon Petroleum Operating Co.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, April 2023 through August 2026. Not a forecast, not reserves.

41 months against 7 other recordsNew

Every month since April 2023, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Jan 2026
1,459 barrels · down 52.6% on the three months before
Oil averaged $60.04 a barrel · Apache Corporation
  • No public record explains this drop.
SINCEAPR 202320242025202605,00010,00015,00020,000BARRELS A MONTH1 NEW WELLLAST 12 MONTHS1234567WEATHERTHE STATEOIL PRICENEXT DOOROPERATORBUYERSTHE FIELDCallon Petroleum Operating CoApache Corporation202420252026
Seven drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly oil sold from this lease since April 2023, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 41 months from April 2023 to August 2026. The most in one month: 16,222 barrels, May 2023. The newest month: 4 barrels. Moments marked: 1, Apr 2024; 2, Feb 2025; 3, Mar 2025; 4, Aug 2025; 5, Sep 2025; 6, Oct 2025; 7, Jan 2026.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

38 months, one line eachNew

No silent months from April 2023 through May 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, from April 2023 through May 2026. The report on file for August 2026 shows a sale and nothing produced.

4

barrels of oil on the newest report on file with oil or gas, for August 2026, the State's newest month.

38

of 38 months with oil or gas reported since April 2023.

70.3

barrels of oil a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

April 2023Taller line, more oil soldMay 2026
202420252026

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, April 2023 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

4 years of state records, 2023 to 2026

Sold since April 2023

$13.2million

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Oil sold
163,399barrels
Gas sold
182,016thousand cubic feet
Best year
2023$7.21 million sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2023 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2023$6.99 million$225,000$7.21 million, sold the most
2024$2.85 million$94,900$2.95 million
2025$1.08 million$79,300$1.16 million
2026, 2026 so far$1.75 million$93,900$1.84 million

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since April 2023. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed once, most recently in August 2024

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Apache CorporationAugust 2024 to now
  2. Callon Petroleum Operating CoApril 2023 to July 2024

SourcesRailroad Commission production reports, the operator on each month’s report, April 2023 through August 2026.

The newest well, seen from the side

No well on the way. Well 9UA was completed in April 2023.

ground2,000 ft4,000 ft6,000 ft8,000 ft10,000 ft9UA11,357 ft deep5,825 ft sideways
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedApril 11, 2023
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
150producing
0fracked and waiting
10permits, last 24 months
72plugged
52original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/shortleaf-a2-08-59761"><img src="https://royaltyclerk.com/maps/lease-wells/shortleaf-a2-08-59761.svg" alt="Map of the Shortleaf A2 lease in Ward County, Texas: its well ringed, among 260 wells and 10 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/shortleaf-a2-08-59761">Wells on the Shortleaf A2 lease, Ward County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Shortleaf A2
WellAPI numberCompletedSidewaysfeetDepthfeetToday
9UA42-475-38469April 20235,82511,357Active

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

327acres on the newest permit

327 ACRES
  • 327 acres, on the 2022 permits
Worth asking

An allocation well is on this lease A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

Check your decimal on this lease

Oil, August 2026, dollars per barrel New

Four prices for the same oil

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$83.90
The marketWTI Cushing, August 2026
$92.02
+$8.129.68% higher
Told its investorsAPA Corporation, July to September 2026
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordNo lower tax on record

No lower tax approval on file

Usual oil rate
4.60%
Usual gas rate
7.50%

No lower tax approval appears for this lease in the two years covered by the Comptroller’s list as of October 1, 2026.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$729a month

At these prices the whole lease’s reported sales were about $2.24 million over 12 reported months. Your estimated share is $8,740 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260.0156$1.310$0.00$1.31
July 20260.6445$51.860.4375$1.26$53.12
June 20269.3164$790.1213.3516$42.06$832.18
May 202614.8242$1,514.0018.5977$54.68$1,568.67
April 202619.4297$1,949.1924.9375$69.08$2,018.26
March 202618.5703$1,696.9625.8164$78.48$1,775.44
February 20267.3242$472.497.8984$28.59$501.08
January 20265.6992$342.1811.9961$92.61$434.79
December 202512.3359$715.1114.5352$61.92$777.03
November 202512.0234$722.1315.3086$58.02$780.15
October 20250.0039$0.240.0039$0.01$0.25
September 20250.0313$2.000.0469$0.14$2.14

SourcesMarket: U.S. Energy Information Administration (WTI Cushing for oil; Henry Hub for gas, taken per thousand cubic feet). Investors: APA Corporation, Form 10-Q, Q3 2026, company-wide. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

OIL
Runs the leaseApache Corporationsince August 2024
Gathers 50%MEDALLION OPERATING COMPANY, LLCsince January 2025

No shared owner, officer or address on record between the oil buyers and the operator.

Also on the P-4: PLAINS PIPELINE L.P. gathers 50%.

GAS
Runs the leaseApache Corporationsince August 2024
Gathers and buys 100%BRAZOS MIDSTREAM OPERATING, LLCsince April 2023

No shared owner, officer or address on record between the gas buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
RIO ENERGY INTERNATIONAL, INC.OilGathersApr 2023Jan 2025
MEDALLION OPERATING COMPANY, LLCOilGathersApr 2023Jan 2025

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-1203 · SEC. 112 · BLK 34 · H&TC RR COA-233 · SEC. 110 · BLK 34 · H&TC RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN034 mcf
FEB035 mcf
MAR0none
APR0none
MAY0210 mcf
JUN01 mcf
JUL02 mcf
AUG01 mcf
SEP01 mcf
OCT01 mcf
NOV098 mcf
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

9

months in which flaring was reported, 383 thousand cubic feet in all.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

96.2%Sold21,158 thousand cubic feet
2.02%Used on the lease443 thousand cubic feet
1.74%Flared or vented383 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of Shortleaf A2 gas by disposition code each month, September 2023 to July 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. 0.6% of the gas was flared in the last 12 months. 5 months above 3%, the most 33.3% in October 2025.Share of the lease’s gas by disposition code, per month0%50%100%Aug 2024: plant to lineFlared 33.3%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of Shortleaf A2 gas by disposition code each month, September 2023 to July 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. 0.6% of the gas was flared in the last 12 months. 5 months above 3%, the most 33.3% in October 2025.Share of gas by disposition code0%50%100%Aug 24: plant to lineFlared 33.3%Jan 24JulJan 25JulJan 26Jul
  • Transmission line (2)98% · 34,335 mcf
  • Lease fuel (1)1.4% · 486 mcf
  • Flared (4)0.6% · 205 mcf

0.6% of the gas was flared in the last 12 months. 5 months above 3%, the most 33.3% in October 2025.

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to July 2026.

Ward County Appraisal District, 2026 mineral roll

14 royalty accounts on the county roll

Ward County Appraisal DistrictMineral roll 2026 · RRC 08-59761
ReadOct 7, 2026
Owners
16
Accounts
17
Appraised in all
$425k$425,470

Is one of these yours?

Each square is one account

  • Royalty 14
  • Overriding royalty 2
  • Working interest 1

SourceWard County Appraisal District, 2026 mineral roll (source), read October 7, 2026. Accounts matched to this lease by RRC number or lease name.

From the state record

What owners ask about Shortleaf A2

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
OILMedallion Operating Company, LLC50%
GASBrazos Midstream Operating, LLC100%
Oil: Medallion Operating Company, LLC and Plains Pipeline L.p. gather it. Gas from oil wells: Brazos Midstream Operating, LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Apache Corporation, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

41 months, newest first

Ledger for Shortleaf A2
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
AugustAug 2026400$336Apache Corporation
JulyJul 202616511214 · 12.5%$13,600Apache Corporation
JuneJun 20262,3853,41879$213,000Apache Corporation
MayMay 20263,7954,76111$402,000Apache Corporation
AprilApr 20264,9746,3840$517,000Apache Corporation
MarchMar 20264,7546,6090$455,000Apache Corporation
FebruaryFeb 20261,8752,0220$128,000Apache Corporation
JanuaryJan 20261,4593,0710$111,000Apache Corporation
DecemberDec 20253,1583,7210$199,000Apache Corporation
NovemberNov 20253,0783,91998$200,000Apache Corporation
OctoberOct 2025111 · 100%$64Apache Corporation
SeptemberSep 20258121 · 8.33%$547Apache Corporation
AugustAug 20252593051$17,700Apache Corporation
JulyJul 20258811,3502$64,600Apache Corporation
JuneJun 20251,3412,1001$97,800Apache Corporation
MayMay 20251,5381,866210 · 11.3%$101,000Apache Corporation
AprilApr 20251,2802,0650$88,400Apache Corporation
MarchMar 20251,4301,8580$105,000Apache Corporation

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Apache Corporation in Ward County

All Apache Corporation leases

Phantom (Wolfcamp) field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • UNIVERSITY 16-31A #1Hnew drill · horizontal · XTO Energy Inc. · Apr 15, 2026 · 7.9 km
  • PYOTE MONITOR #12reclass · XTO Energy Inc. · Apr 9, 2026 · 8.3 km
  • UL SUPER FORTRESS B 37-32 #303HUnew drill · horizontal · Iron Orchard Operating LLC · Oct 17, 2025 · 6.6 km
  • UL SUPER FORTRESS A 37-32 #202HUnew drill · horizontal · Iron Orchard Operating LLC · Oct 17, 2025 · 6.6 km
  • UL SUPER FORTRESS C 37-32 #403Hnew drill · horizontal · Iron Orchard Operating LLC · Oct 17, 2025 · 6.6 km

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • SEC EDGAR company filings
  • FracFocus frac dates
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • Ward County Appraisal District mineral roll
  • U.S. Geological Survey photos