Pick the year they passed and see what the lease has sold since.
Wells on this lease and around it
Where the state's map puts this lease's 3 wells, and what has been drilled or permitted within about 2 miles of them.
This lease3Its wells, ringed on the map: 1 producing, 2 plugged
Drilling locations17Permits issued in the last two years
Producing wells471On a lease reporting production now
Not producing30Shut in, inactive or no lease on record
Plugged36The state's wellbore record says plugged
The 3 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/masterson-10-01524"><img src="https://royaltyclerk.com/maps/lease-wells/masterson-10-01524.svg" alt="Map of the Masterson lease in Moore County, Texas: its 3 wells ringed, among 537 wells and 17 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/masterson-10-01524">Wells on the Masterson lease, Moore County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>
Other leases named Masterson
298 leases share this name in district 10; the 60 most active are below. The Railroad Commission gives each gas well its own number and each oil lease another, so one unit often shows up as several of these.
2 leases in Moore County in the same field or with the same operator carry the Masterson name. Operators often name the leases on one family's land alike, with a letter or unit number after the name. Sharing a name proves no tie: your division order says which ones pay you.
Oil output rose 37% over the last 12 monthsMonthly oil production and gas for MASTERSON, Sep 2023 to Aug 2026. Oil output rose 37% over the last 12 months. 160 bbl in the 12 months through Aug 2026, against 117 bbl in the 12 months before.Last 12 months: 160 bblbbl per monthmcf per month00510102015302040Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 37% over the last 12 monthsMonthly oil production and gas for MASTERSON, Sep 2023 to Aug 2026. Oil output rose 37% over the last 12 months. 160 bbl in the 12 months through Aug 2026, against 117 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month00510102015302040Jan 24JulJan 25JulJan 26Jul
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
From the state record
What owners ask about Masterson
01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026 and the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
The Texas Comptroller lists low producing leases for this lease, from Apr 1, 2020. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for August 2026.
Oil: Cp Energy, L.l.c. gathers it. Gas from oil wells: Pioneer Natural Res. Usa, Inc. buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
One company, Beren Corporation, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
We read every monthly report the Railroad Commission holds, back to January 1993, and this lease was already producing then. It filed 404 monthly reports through August 2026.
Sold since 1993
$355,000
What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.
Its best year was 2007: $37,000 of oil and gas sold
Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.
Oil
Gas
Its best year was 2007: $37,000 of oil and gas soldMasterson: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2007: $37,000 of oil and gas sold.Sold each year, at each month’s prices$0$10k$20k$30k$40kPeak 2007: $37.1k'93'95'00'05'10'15'20'26
Its best year was 2007: $37,000 of oil and gas soldMasterson: oil and gas sold each year from 1993 to 2026, at each month's prices. Its best year was 2007: $37,000 of oil and gas sold.Sold each year, at each month’s prices$0$10k$20k$30k$40kPeak 2007: $37.1k'93'00'05'10'15'20'26
SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.
Every year as a table
Masterson: oil and gas sold each year
Year
Months
Oil sold, bbl
Gas sold, mcf
Sold for
2026 *
8
105
186
$9,456
2025
12
129
234
$9,164
2024
12
128
230
$10,329
2023
12
96
189
$8,010
2022
12
92
213
$10,017
2021
12
100
212
$7,342
2020
12
154
249
$6,719
2019
12
127
151
$7,646
2018
12
134
95
$9,103
2017
12
127
130
$6,909
2016
12
179
235
$8,232
2015
12
235
255
$12,181
2014
12
212
197
$20,694
2013
12
211
317
$21,546
2012
12
206
392
$19,806
2011
12
87
467
$10,126
2010
12
0
0
$0
2009
12
0
0
$0
2008
12
0
0
$0
2007
12
347
2,094
$37,148
2006
12
189
411
$14,983
2005
12
145
136
$9,299
2004
12
140
1,382
$13,847
2003
12
167
2,209
$17,296
2002
12
127
1,639
$9,122
2001
12
142
1,634
$10,651
2000
12
150
1,716
$12,458
1999
12
151
1,760
$6,839
1998
12
168
2,575
$7,919
1997
12
185
2,783
$10,596
1996
12
342
2,416
$13,142
1995
12
0
1,590
$2,560
1994
12
301
1,110
$6,854
1993
12
101
1,502
$5,154
* Part of the year: the records run through August 2026.
Where the gas went
All of the gas went to a transmission line in the last 12 months
All of the gas went to a transmission line in the last 12 monthsShare of MASTERSON gas by disposition code each month, Sep 2023 to Aug 2026. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of MASTERSON gas by disposition code each month, Sep 2023 to Aug 2026. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
3 wells on this lease
Wells on MASTERSON
API number
Well
Status
Completed
42-341-00708
Masterson 3
Plugged
–
42-341-81449
Masterson 1
Plugged
Jan 12, 1984
42-341-81451
Masterson 5
Active
Jan 12, 1984
2 of the 3 wells are marked plugged in the Railroad Commission's wellbore records. 1 is not plugged. A plugged well is closed for good. A well that is not plugged can be put back on production, and its operator still owes the plugging.
SourceTexas Railroad Commission production records and full wellbore file.
Buyers and gatherers
Companies named on the Form P-4, by product
Company
Product
Role
Share%
From
Cp Energy, L.l.c.
Oil
Gathers
100
Feb 1, 2015
Pioneer Natural Res. Usa, Inc.
Casinghead gas
Buys
100
May 1, 2010
Pioneer Natural Res. Usa, Inc.
Casinghead gas
Gathers
100
May 1, 2010
SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).