Skip to content
Royalty Clerk

Texas gas well

Producing

UL 18 BENNY WEST E

Ul 18 Benny West E is a gas well in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field.

1 well

486,148mcf gas, last 12 months
RRC lease
08-301290

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Oil, last 12 months
102,310 bbl
Gas in Jul 2026
32,872 mcf

Production by month

Gas output since Jan 2025

  • Gas (bars)
  • Oil (line)
  • Last 12 months
Gas output since Jan 2025Monthly gas production and oil for UL 18 BENNY WEST E, Jan 2025 to Jul 2026. Gas output since Jan 2025. Monthly average of 42,474 mcf in the latest 3 months, against 0 mcf in the first 3.Last 12 months: 486,148 mcfmcf per monthbbl per month0020k2,50040k5,00060k7,50080k10k100k12.5kJan 25AprJulOctJan 26AprJul
Gas output since Jan 2025Monthly gas production and oil for UL 18 BENNY WEST E, Jan 2025 to Jul 2026. Gas output since Jan 2025. Monthly average of 42,474 mcf in the latest 3 months, against 0 mcf in the first 3.Last 12 monthsmcf per monthbbl per month0020k2,50040k5,00060k7,50080k10k100k12.5kJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

99% of the gas went to a transmission line in the last 12 months

  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
99% of the gas went to a transmission line in the last 12 monthsShare of UL 18 BENNY WEST E gas by disposition code each month, Jan 2025 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Jan 25AprJulOctJan 26AprJul
99% of the gas went to a transmission line in the last 12 monthsShare of UL 18 BENNY WEST E gas by disposition code each month, Jan 2025 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    99% · 481,335 mcf

  • Flared (4)

    1.0% · 4,751 mcf

  • Lease fuel (1)

    0.0% · 62 mcf

1.0% of the gas flared in the last 12 months. No month above 3%.

1 well on this lease

Wells on UL 18 BENNY WEST E
API numberWell no.Status
42-475-388695BSActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Energy Transfer CompanyCondensateGathers100Jan 26, 2025
Scm Ops, LLCGas-well gasBuys100Jan 26, 2025
Scm Ops, LLCGas-well gasGathers100Jan 26, 2025

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

890.56 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

Check your decimal on this lease
Permits for Ul 18 Benny West E
API numberWell no.Acreson the permit
42-475-388695BS890.56

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

19 months, newest first

Ledger for UL 18 BENNY WEST E
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20265,6495,65032,87232,749123$80.46$2.89
Jun 20266,2326,23539,84239,678164$84.81$3.15
May 202610,95410,94854,70954,491218$102.13$2.94
Apr 20265,4725,47540,13640,05779$100.32$2.77
Mar 20266,8636,88533,08632,966120$91.38$3.04
Feb 20267,7827,78529,65329,57073$64.51$3.62
Jan 20267,9377,94035,34434,657677$60.04$7.72
Dec 20259,1029,11740,28740,116160$57.97$4.26
Nov 202512,03812,05343,86643,296555$60.06$3.79
Oct 202510,29510,31638,99838,308674$60.89$3.19
Sep 202511,48311,55148,05647,604452$63.96$2.97
Aug 20258,5038,34749,29947,8431,456$64.86$2.91
Jul 2025494984821$68.39$3.20
Jun 202500000$68.17$3.02
May 202500000$62.17$3.12
Apr 202500000$63.54$3.42
Mar 202500000$68.24$4.12
Feb 202500000$71.53$4.19
Jan 202500000$75.74$4.13

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Apache Corporation in Ward County

All Apache Corporation leases →

Leases within 10 km

Drilling permits within 10 km