Skip to content

Texas oil lease · RRC district 08 · Lease 59768

Shut in

SHORTLEAF A5

Shortleaf A5 is an oil lease in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field. The Railroad Commission shows 5 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

5bbl oil, last 12 months−100% vs prior year
RRC lease
08-59768

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County · RRC district 08Open Ward County →
Gas, last 12 months
7 mcf
Oil in Jul 2026
0 bbl
Reporting to the state
since Apr 2023
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 100% over the last 12 months

5 bbl in the 12 months through Jul 2026, against 5,116 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 100% over the last 12 monthsMonthly oil production and gas for SHORTLEAF A5, Aug 2023 to Jul 2026. Oil output fell 100% over the last 12 months. 5 bbl in the 12 months through Jul 2026, against 5,116 bbl in the 12 months before.Last 12 months: 5 bblbbl per monthmcf per month002,0005,0004,00010k6,00015k8,00020kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 100% over the last 12 monthsMonthly oil production and gas for SHORTLEAF A5, Aug 2023 to Jul 2026. Oil output fell 100% over the last 12 months. 5 bbl in the 12 months through Jul 2026, against 5,116 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002,0005,0004,00010k6,00015k8,00020kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 59768, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 50.0% of the gas in Jul 2025.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of SHORTLEAF A5 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 50.0% of the gas in Jul 2025.Share of the lease’s gas by disposition code, per month0%50%100%Aug 2024: plant to lineFlared 50.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of SHORTLEAF A5 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not. Flaring peaked at 50.0% of the gas in Jul 2025.Share of gas by disposition code0%50%100%Aug 24: plant to lineFlared 50.0%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 59768, district 08. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the last 12 months, 0.2% of the gas was flared. 5 months went above 3%, which we mark in the ledger below.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Aug 2024

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeCallon Petroleum Operating Co, Apr 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoApr 2023 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, Apr 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoApr 2023 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 59768 in district 08. The API number is the state’s ID for a well.
Wells on SHORTLEAF A5
API numberWell no.Status
42-475-384873LAActive

SourceTexas Railroad Commission Wellbore Query, district 08, lease 59768.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Medallion Operating Company, LLC and Plains Pipeline L.p. gather it.

    Medallion Operating Company, LLC gathers it: 50% of it, on the list since Jan 1, 2025 · Plains Pipeline L.p. gathers it: 50% of it, on the list since Jan 1, 2025

  • Gas from oil wells

    Brazos Midstream Operating, LLC buys and gathers it.

    Brazos Midstream Operating, LLC buys it: 100% of it, on the list since Apr 11, 2023 · Brazos Midstream Operating, LLC gathers it: 100% of it, on the list since Apr 11, 2023

Companies that used to be listed: Medallion Operating Company, LLC (gathers it, until Jan 1, 2025); Rio Energy International, Inc. (gathers it, until Jan 1, 2025).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

326.89 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Apr 11, 2023
Latest permit
Nov 21, 2022

An allocation well is on this lease

A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

Wells and acres on the permits for Shortleaf A5
API numberWell no.Acreson the permit
42-475-384873LA326.89

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

What the operator reported

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA). Public companies report the average price they realize each quarter. It is an average across everything the company operates, not the price on this lease.
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports on SEC EDGAR, prices before hedging where the company states both. Read by machine from each filing’s tables; the link opens the filing so you can check the figure.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says SHORTLEAF A5 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for SHORTLEAF A5
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Apache Corporation00000$80.46$2.89
Jun 2026Apache Corporation00000$84.81$3.15
May 2026Apache Corporation00000$102.13$2.94
Apr 2026Apache Corporation00000$100.32$2.77
Mar 2026Apache Corporation00000$91.38$3.04
Feb 2026Apache Corporation00000$64.51$3.62
Jan 2026Apache Corporation00000$60.04$7.72
Dec 2025Apache Corporation00000$57.97$4.26
Nov 2025Apache Corporation00000$60.06$3.79
Oct 2025Apache Corporation22311$60.89$3.19
Sep 2025Apache Corporation33431$63.96$2.97
Aug 2025Apache Corporation00000$64.86$2.91
Jul 2025Apache Corporation00211$68.39$3.20
Jun 2025Apache Corporation00110$68.17$3.02
May 2025Apache Corporation011321$62.17$3.12
Apr 2025Apache Corporation2232205975970$63.54$3.42
Mar 2025Apache Corporation2752676546540$68.24$4.12
Feb 2025Apache Corporation0139338112$71.53$4.19
Jan 2025Apache Corporation375734321$75.74$4.13
Dec 2024Apache Corporation5545421,1391,1200$70.12$3.01
Nov 2024Apache Corporation3593551,9451,9340$69.95$2.12
Oct 2024Apache Corporation2142372,6512,6450$71.99$2.20
Sep 2024Apache Corporation1,4371,4512,9052,9031$70.24$2.28
Aug 2024Apache Corporation2,0171,9884,4394,38651$76.68$1.99
Jul 2024Callon Petroleum7217081,3701,3237$81.80$2.07
Jun 2024Callon Petroleum00000$79.77$2.54
May 2024Callon Petroleum05000$80.02$2.12
Apr 2024Callon Petroleum5095061,2081,0871$85.35$1.60
Mar 2024Callon Petroleum2392401,8031,7000$81.28$1.49
Feb 2024Callon Petroleum1872831,4261,31421$77.25$1.72
Jan 2024Callon Petroleum1,8501,8312,7472,59957$74.15$3.18
Dec 2023Callon Petroleum2,3812,3742,9962,9005$71.90$2.52
Nov 2023Callon Petroleum2,6282,6174,2404,1460$77.69$2.71
Oct 2023Callon Petroleum2,8832,8886,5926,4845$85.64$2.98
Sep 2023Callon Petroleum3,7213,7306,7826,6740$89.43$2.64
Aug 2023Callon Petroleum7,2987,36412,56812,4140$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for SHORTLEAF A5. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Apache Corporation.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Apache Corporation in Ward County

All Apache Corporation leases →

Phantom (Wolfcamp) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 59768, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.